Set Homepage | Favorite

The difference between pull rod point type glass curtain wall and cable point type glass curtain wal

1. pull rod point type glass curtain wall

The pull rod point connection all glass curtain wall is a stainless steel bar flexible support structure instead of a rigid truss structure. The utility model relates to a pull rod type point feeding all glass curtain wall, which adopts a prestressed double-layer pulling rod structure. The general design of symmetrical type, this is because the wall not only to be under positive pressure, but also bear the negative pressure, positive pressure bearing cable in negative pressure becomes stable and the negative pressure rod; a bearing rod in positive pressure when it becomes stable cable. Thus, the force integrity of the double deck bar structure under the condition of positive and negative wind pressure is guaranteed. The double pull rod structure construction and design is very close contact, design, construction steps must be considered, in particular must be pre specified prestress and the laying of the panel procedure, the actual construction must be carried out in strict accordance with the provisions of the procedures.

2. cable point type glass curtain wall

The cable point type all glass curtain wall is a flexible support structure made of stainless steel cable instead of rigid truss structure. The cable type point connection all glass curtain wall adopts prestressed double-layer suspension structure. The general design of symmetrical type, this is because the wall not only to be under positive pressure, but also bear the negative pressure, positive pressure in the negative pressure bearing cable becomes stable cable; and negative pressure bearing cable in positive pressure when it becomes stable cable. Thus, the mechanical integrity of double layer cable structure under the condition of positive and negative wind pressure is guaranteed. Double suspension structure design and construction is closely connected, when the design, must advance considering construction steps, in particular must be pre specified prestress and the laying of the panel procedure, the actual construction must be carried out in strict accordance with the provisions of the procedures.


Live Help
 
 

Online time:08:00-17:30

瑞騰幕墻 Contact us

瑞騰幕墻Contact us

咨詢熱線:+86-18061018158

Sharing web site
 
 
影音先锋91在线_超碰丁香五月_国产一级大A片_日韩av观看网站

    <nav id="wyhmi"></nav>
    <dfn id="wyhmi"><del id="wyhmi"><s id="wyhmi"></s></del></dfn>

    • 日韩欧美大香蕉| 日本华人男人的天堂| AV不卡网| 亚洲一级黄色| 伊人VS久久| 亚洲色情在线播| 91亚洲超碰在线| 无码一区二区三区不卡| 亚洲性爱A片| 超碰在线人妻日本| .日韩黄色AV网站| 手机AV在线免费看| 黄色大片网址在线观看| 免费无码婬片A片AAA| 有码一区二区三区| 97操导航| 亚洲成人在线观看777| 五月天色色婷婷| 超碰人人cao| 日本aa黄色片| 鸥美黄片| A黄色片在线观看| 亚洲黄伦乱小说网| 无毒免费黄色网址| 七七久久视频| 欧美色图色| 加勒比青青草| 无码AV妞妞网| 精品黄色电影| 三级片AV免费观看| 在线毛片网站| www.色色av| 亚洲性爱成人电影| 一区二区黄片| 99大香蕉视频在线| 成人操屄AV| 老司机探花| 成人网777色天堂| 欧美一级特黄A片免费看| 美女一级A片| 黄色97AV|